Guide for New Connection Application: Requirements, Process, and Fees

Events
Guide for New Connection Application: Requirements, Process, and Fees
Posted by
Posted July 31, 2026
Views 22

๐—ฅ๐—˜๐—ค๐—จ๐—œ๐—ฅ๐—˜๐— ๐—˜๐—ก๐—ง๐—ฆ (For Residential at Low Voltage Applicants)

 

1. ๐—˜๐—น๐—ฒ๐—ฐ๐˜๐—ฟ๐—ถ๐—ฐ๐—ฎ๐—น ๐—ฃ๐—น๐—ฎ๐—ป/๐—Ÿ๐—ฎ๐˜†๐—ผ๐˜‚๐˜

 - Duly signed by a Professional Electrical Engineer (PEE).

2. ๐—–๐—ฒ๐—ฟ๐˜๐—ถ๐—ณ๐—ถ๐—ฐ๐—ฎ๐˜๐—ฒ ๐—ผ๐—ณ ๐—™๐—ถ๐—ป๐—ฎ๐—น ๐—˜๐—น๐—ฒ๐—ฐ๐˜๐—ฟ๐—ถ๐—ฐ๐—ฎ๐—น ๐—œ๐—ป๐˜€๐—ฝ๐—ฒ๐—ฐ๐˜๐—ถ๐—ผ๐—ป (๐—–๐—™๐—˜๐—œ).
   - Kunin sa Municipal Building Official.

3. ๐—˜๐—น๐—ฒ๐—ฐ๐˜๐—ฟ๐—ถ๐—ฐ๐—ฎ๐—น ๐—ฃ๐—ฒ๐—ฟ๐—บ๐—ถ๐˜
   - Kunin sa Municipal Building Official.

4. ๐—™๐—ถ๐—ฟ๐—ฒ ๐—ฆ๐—ฎ๐—ณ๐—ฒ๐˜๐˜† ๐—ฃ๐—ฒ๐—ฟ๐—บ๐—ถ๐˜
   Kunin sa Fire Station

5. ๐—ž๐—ผ๐—ฝ๐˜†๐—ฎ ๐—ป๐—ด ๐—ฃ๐—˜๐—Ÿ๐—–๐—ข ๐—œ๐—œ ๐—•๐—ถ๐—น๐—น๐—ถ๐—ป๐—ด ๐—ฆ๐˜๐—ฎ๐˜๐—ฒ๐—บ๐—ฒ๐—ป๐˜ ๐—ป๐—ด ๐—ฝ๐—ถ๐—ป๐—ฎ๐—ธ๐—ฎ๐—บ๐—ฎ๐—น๐—ฎ๐—ฝ๐—ถ๐˜ ๐—ป๐—ฎ ๐—ธ๐—ฎ๐—ฝ๐—ถ๐˜๐—ฏ๐—ฎ๐—ต๐—ฎ๐˜†.

6. ๐—–๐—น๐—ฒ๐—ฎ๐—ฟ๐—ฎ๐—ป๐—ฐ๐—ฒ ๐—ฎ๐˜ ๐—ฆ๐—ถ๐—ป๐˜‚๐—บ๐—ฝ๐—ฎ๐—ฎ๐—ป๐—ด ๐—ฆ๐—ฎ๐—น๐—ฎ๐˜†๐˜€๐—ฎ๐˜† ๐—™๐—ผ๐—ฟ๐—บ.
   - Kunin sa PELCO II Area Office

7. ๐——๐—ฎ๐—น๐—ฎ๐˜„๐—ฎ๐—ป๐—ด (๐Ÿฎ) ๐—ฝ๐—ถ๐—ฟ๐—ฎ๐˜€๐—ผ ๐—ป๐—ด ๐Ÿฎ ๐˜… ๐Ÿฎ ๐—ฐ๐—ผ๐—น๐—ผ๐—ฟ๐—ฒ๐—ฑ ๐—ฝ๐—ถ๐—ฐ๐˜๐˜‚๐—ฟ๐—ฒ.

8. ๐—œ๐˜€๐—ฎ๐—ป๐—ด (๐Ÿญ) ๐˜ƒ๐—ฎ๐—น๐—ถ๐—ฑ ๐—œ๐—— (๐—ฝ๐—ต๐—ผ๐˜๐—ผ๐—ฐ๐—ผ๐—ฝ๐˜† ๐—น๐—ฎ๐—บ๐—ฎ๐—ป๐—ด).

9. ๐—ฃ๐—ฟ๐—ฒ-๐— ๐—ฒ๐—บ๐—ฏ๐—ฒ๐—ฟ๐˜€๐—ต๐—ถ๐—ฝ ๐—˜๐—ฑ๐˜‚๐—ฐ๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐—ฆ๐—ฒ๐—บ๐—ถ๐—ป๐—ฎ๐—ฟ (๐—ฃ๐— ๐—˜๐—ฆ) ๐—”๐˜๐˜๐—ฒ๐—ป๐—ฑ๐—ฎ๐—ป๐—ฐ๐—ฒ
   • Ginaganap tuwing Martes at Huwebes, 1:30 ng hapon
   • Online (Zoom):
     – Zoom ID: 423 197 9811
     – Passcode: PELCO

 

๐— ๐—š๐—” ๐—›๐—”๐—ž๐—•๐—”๐—ก๐—š ๐—ฆ๐—” ๐—ฃ๐—”๐—š-๐—”๐—”๐—ฃ๐—ฃ๐—Ÿ๐—ฌ (PROCESS)

 

๐—ฆ๐˜๐—ฒ๐—ฝ ๐Ÿญ: Dumalo sa Pre-Membership Education Seminar (PMES).

๐—ฆ๐˜๐—ฒ๐—ฝ ๐Ÿฎ: Kapag kumpleto na ang lahat ng requirements, ipasa ang mga ito sa pinakamalapit na PELCO II Area Office.

๐—ฆ๐˜๐—ฒ๐—ฝ ๐Ÿฏ: Matapos maisumite ang requirements, maghintay ng 2–3 araw para sa PELCO II Housewiring Inspection.

๐—ฆ๐˜๐—ฒ๐—ฝ ๐Ÿฐ: Kapag naaprubahan ng Housewiring Inspector ang inyong aplikasyon, maaari nang bumalik sa Area Office kinabukasan (working days only) upang magbayad.

๐—ฃ๐—”๐—”๐—Ÿ๐—”๐—Ÿ๐—”: Siguraduhing handa at naisagawa ang lahat ng ipinagawa o ipinayo ng Housewiring Inspector bago ang installation ng kontador.

Step 5: Pagkatapos magbayad, ang ing inyong kilowatt-hr meter ay naka schedule for installation.

 

๐— ๐—š๐—” ๐—•๐—”๐—•๐—”๐—ฌ๐—”๐—ฅ๐—”๐—ก (Cooperative Fees)

 

1. Membership Fee – โ‚ฑ5.00.
2. Inspection Fee – Depende sa laki/sukat ng bahay.
3. Meter Seal Fee – โ‚ฑ25.00.
4. Calibration Fee – โ‚ฑ56.00.
5. Bill Deposit – Depende sa laki/sukat ng bahay.
6. Service Drop
   • Libre ang unang 30 meters para sa mga Residential Applicants.
   • May kaukulang bayad bawat metro para sa lalampas sa 30 meters at sa Non-Residential.

 

Welcome to Pelco II
Experience Reliable Power with Pampanga II Electric Cooperative, Inc.
Join us today and enjoy uninterrupted electricity service! Discover the convenience and reliability of Pampanga II Electric Cooperative, Inc. Sign up now and be part of our growing community.
Contact Us arrow_right